Skip to content
Feedback button

Highway Construction Details


The standard drawings supplement the Highways Agency Highway Construction Details. For convenience these are drawn in the same general style and layout. These standard drawings should be used in conjunction with national and local guidance.

Feedback

You must not alter these drawings. To maintain the integrity and relevance of these drawings, feedback is essential. This can be emailed to highways-estates@cornwall.gov.uk.  Feedback may include (but is not limited to):

  • comments on the accuracy of drawings
  • requests for updates
  • requests for new drawings

Drawing Control

The list of drawings below is a definitive set of the Construction Details. Do not store paper copies, other than for record purposes, to ensure that you are using the latest version. Drawing updates are recorded on the Register of Amendments.

Statutory Requirements

The following note applies to the use of drawings numbers 7/3, 7/4, 7/5, 12/31, 12/32, 12/33 and 12/34.

Construction or use of the features shown on these drawings may need

  • Statutory Orders
  • Statutory Consultation
  • Highways Agency approval

If you wish to use any of them contact highways-estates@cornwall.gov.uk for advice.

List of Drawings

Open the links below to view the Highway Construction drawings.

Drawing No Series 100 - Preliminaries Issue Date

1/13

Information Board type A

F

May 2012

1/19

Cornwall Council logo for information boards

C

October 2008

1/22

Information Boards - type 1, 2 and 3

D

May 2012

 

Drawing No Series 300 - Fencing Issue Date

3/3

Fence type 5

C

May 2012

3/4

Fence type 6

D

May 2012

3/10

Fence type 7 (timber post and four rail fence - badger proof)

D

May 2012

3/11

Fencing at ditch and stream crossing

D

May 2012

3/14

Fence type 8 (chain link badger proof fence)

B

May 2012

3/17

Temporary tree protection fence

B

May 2012

 

Drawing No Series 400 - Safety Fences, Safety Barriers and Pedestrian Guardrails Issue Date

4/2

Pedestrian guardrail - types 1 and 2

C

February 2009

4/3

Pedestrian guardrail - type 3

C

February 2009

4/100

Pedestrian guardrails

B

February 2009

 

Drawing No Series 600 - Earthworks Issue Date

6/1

Benching into steeply slopping ground

B

July 1997

6/2

Excavation at change from cut to fill

B

July 1997

Drawing No Series 1200 - Traffic Signs Issue Date

12/2

Traffic sign installation

E

November 2019

12/4

Hazard marker posts and environmental reflectors

C

March 2010

12/6

Road stud location details

A

March 2001

12/10

Refuge beacon and zebra crossing beacon

B

March 2010

12/11

Zebra crossing beacon

A

January 2009

12/20

Traffic signals

C

March 2010

12/21

Installation of British Telecom duct into signal controller

A

December 1997

12/32

Road markings rumble strips

C

September 2012

12/33

White line marking cycle and children warning triangles

B

March 2010

12/34

White line road marking dragons teeth details

B

March 2010

12/36

Controlled pedestrian crossing footway detail

D

July 2011

12/37

50mm yellow lines abutting and terminating at 100mm yellow lines

A

June 2009

12/100

Hazard Warning (ITC Sign 001) Vehicle Activated Sign

C

March 2013

12/101

School Warning (ITC Sign 002) Variable Speed Limit Sign

B

November 2012

12/102

Speed Warning (ITC Sign 003) Vehicle Activated Sign

C

March 2013

12/103

Combination Warning (ITC Sign 004) Vehicle Activated Sign

C

March 2013

12/104

Combination Speed Warning (ITC Sign 005) Vehicle Activated Sign

B

March 2013

12/105

Text Matrix (ITC Sign 006) Variable Message Sign

B

November 2012

12/106

Advance Direction Car Park & Information (ITC Sign 007) Variable Message Sign

C

January 2013

12/107

Advance Direction Car Park (ITC Sign 008) Variable Message Sign

C

January 2013

12/108

Car Park Information (ITC Sign 009) Variable Message Sign

C

November 2012

12/109

Prohibition Notice (ITC Sign 010) Variable Message Sign

B

November 2012

12/110

Moveable vehicle activated sign

C

March 2013

12/111

Foundation for 1 x 140mm dia post

B

November 2012

12/112

Foundation for 2 x 140mm dia post

B

November 2012

12/113

Foundation for 1 x 168mm dia post

B

November 2012

12/114

Foundation for 3 x 168mm dia post

B

November 2012

12/115

Rising bollard installation General Layout

C

March 2013

12/116

Rising Bollard Chamber Installation

B

March 2013

12/117

KeySignals AutoCAD Legend

C

March 2013

12/118

Minimum Clearance Dimensions - all dimensions in millimetres

B

November 2012

12/119

Recommended Layouts & Distances

C

March 2013

12/120

Puffin Sites - Various Lanes for clarity schematic only

B

November 2012

12/121

Pelican Sites - Various Lanes for clarity schematic only

B

November 2012

12/122

114mm retention socket low risk areas

B

November 2012

12/122A

140mm retention socket low risk areas

B

November 2012

12/123

114mm Retention Socket high risk areas

B

November 2012

12/123A

 140mm Retention Socket high risk areas

B

November 2012

12/124

Passive Traffic Signal Pole (Sapa Pole)

A

November 2012

12/125

WPD Standard Joint Pit Dimensions HES References

B

November 2012

12/126

Signal Controller Installation

B

November 2012

12/127

Signal Controller Cabinet Base Installation

A

November 2012

12/128

Access Chamber Installation

A

January 2009

12/129

Carriageway Loop Box Installation

A

January 2009

12/130

Brick Built Access Chamber Installation

A

January 2009

12/131

Pole Box Chamber Installation

A

January 2009

12/132

Signal Orientation Identification Signals Management Systems References

A

January 2009

12/133

Sign Orientation Identification Signals Management Systems References

A

January 2009

12/134

Real Time Passenger Information Sign Installation

B

January 2014

 

Drawing No Series 1300 - Roads Lighting Columns and Brackets, CCTC Masts and Cantilever Masts Issue Date

13/101

Street lighting column erection

B

February 2010

13/102

Street lighting column / wall bracket / pole bracket details

B

February 2010

13/103

Street lighting twin and single arm stub bracket

C

March 2010

13/104

Electrical unit reference plates and warning signs

B

February 2010

13/105

Tree trimming requirements

B

February 2010

13/106

Street lighting internal and external shields

B

February 2010

13/107

Lighting / sign support painting options

B

February 2010

13/108

Up and over pole brackets and steel poles

B

February 2010

13/109

Lamp and sign orientation identification lighting management system references

B

February 2010

13/110

Refuge beacon and zebra crossing beacon

A

November 2012

13/111

CCTV pole installation details

A

November 2012

 

Drawing No Series 2600 - Miscellaneous Issue Date

26/1

Cycle stand

B

March 2009

26/100

Step detail

D

March 2009

26/101

Cast iron bollard

C

March 2009

 

Drawing No Series 2700 - Accommodation Works and Works to Public Utilities Issue Date

27/1

Trenches for mains

C

March 2009

27/2

Protection to mains and services 

C

April 2009

27/3

Water Trough

C

April 2009

27/100

Guidelines on arrangements of services in footways

D

April 2009

 

Drawing No Series 7000 - Countryside Access Works Issue Date

70/1

Finger posts - types 1, 2, 3 and 4

C

July 2009

70/2

Sign post and flag detail

A

March 2010

70/3

Finger posts - general details

C

March 2010

70/4

Low level timber signpost

A

March 2010

70/5

Granite waymark

A

March 2010

70/6

Timber boardwalk on railway sleepers

C

March 2010

70/7

Boardwalk on stobs

A

March 2010

70/8

Boardwalk step staircase

A

March 2010

70/9

Boardwalk timber ramp

A

March 2010

70/10

Timber revetment

C

March 2010

70/12

Wide post and rail lifting barrier

A

March 2010

70/13

Narrow post and rail lifting barrier with step

A

March 2010

70/14

Timber stile - type 3

A

March 2010

70/15

Timber stile - type 4

A

September 2010

70/16

Timber stile - type 7

B

March 2010

70/17

Timber stile - type 8

C

October 2010

70/18

Wide post and rail timber stiles (in existing fence)

A

March 2010

70/19

Ancillary features

C

March 2010

70/20

Sawn timber footbridge

C

March 2010

70/21

Bridleway bridge handrail details

A

March 2010

70/23

Bridleway bridge foundation details - types A, B and C

A

March 2010

70/24

Steelwork components for bridges requiring handrails / holding down

A

March 2010

70/25

Cross drains, cutoffs and piping

A

March 2010

70/26

French drains

A

March 2010

70/27

Path construction - type A

A

March 2010

70/28

Path repair / construction

A

March 2010

70/29

Self closing steel kissing gate

C

March 2010

70/31

Pedestrian or bridleway gate timber two-way opening, latched, self closing gate

A

March 2010

70/32

Gaps

A

March 2010

70/33

Rectangular timber stile - type 4

B

September 2010

70/34

Cornish hedge

E

September 2010

70/35

Stile - type 5

D

September 2010

70/36

Stile - type 6

D

September 2010

 

Need help?

Most issues can be resolved online, it's the quickest and most convenient way to get help.